Sergey Nikolaevish Egoshin
First Deputy of the General Manager — Lead Engineer

We completely understand our responsibilities to the consumers. Both industrial workers and the residents of Tyumen Region, Yugra and Yamala know that Tyumenergo is ready to work in any conditions.

5.1

Maintenance Program Implementation

In providing a reliable uninterrupted electricity supply to consumers, it is of high importance that the operating equipment must be maintained in serviceable and good operating condition. Availability for failure free load carrying is achieved by strict compliance with the maintenance terms and regulations, timely diagnostics and determination of maintenance scopes and terms.

According to 2014 results, the Company`s maintenance program has been fully implemented.

Expenses for maintenance of plant and equipment across the Company in 2014 amounted to 3,424.9 mln RUB. Work undertaken by own efforts (using own resources) amounted to 2,039.2 mln RUB, and under third-party contract — 1,385.7 mln RUB.

Expenses for maintenance of plant and equipment across the Company in <nobr>2014</nobr>

Implementation of the maintenance program for the main electrical equipment of SS and OHL of JSC Tyumenenergo for 2014
mln RUB without VAT

Name Own resources method Contract Total
Power Line Maintenance 571, 1 184, 9 386, 2
SS Equipment Maintenance 578, 2 303, 2 275, 0
Buildings and Structures 339, 2 22, 6 316, 6
Other Facilities 390, 7 239, 6 151, 1
Total 1879, 2 750, 3 1128, 9

Implementation of the maintenance program on the main electrical equipment at SS and OHL of JSC Tyumenenergo for 2014, expressed in physical terms

  • Maintenance of power transformers 35110 kV — 54 units;
  • Maintenance of switches — 264 units;
  • Maintenance of circuit breakers — 634 units;
  • Maintenance of 110 kV overhead lines — 1372 km;
  • Maintenance of 35 kV overhead power lines — 84 km;
  • Maintenance of 10 kV overhead power lines — 91 km;
  • Maintenance of 0.4 kV overhead power lines — 40 km;
  • Route clearing — 5892 ha;
  • Maintenance of 10/0.4 kV transformer substations — 127 units

Analysis of maintenance costs for 20132015 mln RUB

Analysis of maintenance costs for <nobr>2013</nobr>–<nobr>2015</nobr>, mln RUB