Activity
area
JSC Tyumenenergo provides electrical power transfer services on the territory of three main oil and gas industrial regions of Russia: Khanty-Mansijsk Autonomous District (Yugra), Yamalo-Nenets Autonomous District and Tyumen Region.
- 87,8%
- The Company`s share in the service market of electrical power transfer on the area as a whole
It is calculated as the ratio of electrical supply volume for
JSC Tyumenenergo area of responsibility
- 71 535
- mln kWh electrical power transferred
in2014 - 12 391,5 MW
- the load peak on the Tyumen energy system
registered on29 Dec.,2014 at18 :00 - 12 025,0 MW
- the annual load peak on the Tyumen energy system in
2013
Energy consumption
by regions
Energy consumption by consumers
Productive power supply to large-scale industrial consumers
from ISC Tyumenenergo networks
JSC Tyumenenergo energy balance for 2014
Power supply
Consumers and Local grid companies power supply
Energy loss
Industrial assets
In
JSC Tyumenenergo today:
- 48 563 km
- overhead line length including
2644 km of rented overhead lines - 576 km
- cable line length including
88 km of rented cable lines - 643
- substations
35 –220 kV with installed transformer capacity of26 ,955 MVA, including three rented substations35 –110 kV with installed transformer capacity of22 MVA - 6517
- transformer substations
10 (6) /0.4 kV with installed transformer capacity of1408 MVA, including1150 rented transformer substations with installed transformer capacity of296.8 MVA
Diagrams below show dynamic pattern of OHL